Clark’s Hydra-Slide skidding system used to replace power transformers

One of Clark Rigging’s newest pieces of equipment was recently utilized to perform a series of transformer replacements at several electrical substations throughout Western New York.

These electrical substations had failed transformers located inside a roofed bay enclosure, or directly under live overhead power lines which limited the use of a crane to move them out.  As an alternative solution, a 150 ton capacity Hydra-Slide XLP150 slider beam system was used as a safe, cost-effective method of moving heavy loads along the ground in areas where overhead space is limited and clearance counts.  

The XLP150 system consists of a hydraulic power pack, a push/pull mechanism, and a modular slide surface.  It is completely hand-portable, simple to assemble, requires limited jacking, and can push or pull up to 150 tons.  With the use of the Hydra-Slide XLP150, Clark Rigging was able to perform a series of these transformer replacements at multiple locations with only a one-day turnaround for each.

Recent Projects

Heavy Rigging – Industrial Manufacturing

It’s not everyday your business receives a new 96,000lb CNC machine. Clark was called upon to move the new machine from from its delivery and install it within the customer’s

Solution Based Services – Telecom

“How are we going to get those under there?” That is what Clark Rigging’s customer asked. Clark is committed to finding a solution that will meet the needs of its

Utility Trust

The lights must stay on! Clark is continuously trusted to provide a reliable service for one of New York’s primary electrical utilities. There is not a week that goes by

Precast Wall Panel Erection – Niagara Falls NY

Clark working alongside their consistent customer mobilized one of their Link-Belt 298 crawler cranes to assist in setting precast concrete wall panels. The project consisted of developing a crane plan

Recent News